Xayaburi:
Xayaburi Hydroelectric Power Project

Disciplines

  • Industry & Energy
  • Power & Electrical
  • Hydraulic Engineering

Companies

Dorsch Consult asia Co., Ltd.

Construction Sum

approx. US$ 2.2 billion

Client

Ch. Karnchang (Lao) Company Limited

Duration

From 2012 to 2019

Project Activities

The scope of services of the Coordination Services of DC asia is provision of a Civil/Mechanical Engineer in the Position of Senior Project Coordinator responsible for the overall communication and coordination, especially with regard to the approval process during the “fast track design” for the first phase of the Project, communication and liaise with the Construction Departments and the Engineering Department, and overseeing and internally auditing the Quality Assurance and the Quality Control.

The scope of services of the Project Control Services is to provide the Project Controls Manager responsible for Project Controls encompassing the management of the staff and processes used to plan, manage and mitigate cost and schedule issues, change management and any risk events that may impact the project.

Contact

Dorsch Consult asia Co., Ltd.

Bangkok (Headquarters)
1168/45 Lumpini Tower,
18th Floor
Rama 4 Road
Tungmahamek, Sathon

10120 Bangkok
Thailand

Phone: +66 2 - 679 89 00
Fax: +66 2 - 679 89 95
E-Mail: dcasia@dorsch.co.th

View in maps

Description

The Xayaburi Hydroelectric Power Project has been proposed on a site located 350 kilometers (220 mi) upstream of Vientiane and 770 kilometers (480 mi) downstream of Jinhong, the last dam of the Chinese cascade of seven dams, including four existing dams and three planned ones. In terms of mean energy supply, it would be the third largest project among those considered for development on the mainstream in the Lower Mekong Basin.

The Xayaburi HPP will be 820 metres (2,690 ft) long and 32.6 metres (107 ft) high with a rated hydraulic head of 18 metres (59 ft). Sitting at the head of a 272,000 sq kilometres (105,000 sq mi) catchment area, it would create a pondage area of 1.3 km3 (1,100,000 acre·ft) gross storage capacity and a surface area of 49 sq kilometres (19 sq mi). The pondage area will reach 30 metres (98 ft) in depth and stretch between 60 and 90 kilometres (37 and 56 mi). The barrage will feature a navigation lock, low level outlets for sediment flushing, a state-of-the-art fish passing facilities and two fish lifts.

The power plant will house seven 175 MW Kaplan turbine-generators and one 60 MW Kaplan turbine generator. The total installed capacity will be 1,285 megawatts, with a total annual energy production of 7,406 GWh. Around 95% of produced electricity (the seven 175 MW generators) will be exported to Thailand through a planned 200-kilometre (120 mi) long transmission line from the Xayaburi HPP to the Loei Province in Thailand. The barrage's construction would take eight years and it would cost approximately US$ 2.2 billion. It is expected to become operational by 28 October 2019.