Wesseling:
Sewer rehabilitation Sternen-/ Langenackerstrasse Wesseling

Disciplines

  • Sanitation

Companies

Dorsch International Consultants

Client

Entsorgungsbetriebe der Stadt Wesseling

Duration

From 2004 to 2006

Project Activities

  • Detailed design and traffic diversion plan
  • Preparation of tender documents
  • Assistance in tendering
  • Construction supervision
  • Project management

Contact

Dorsch International Consultants GmbH

München (Headquarters)
Landsberger Str. 368
80687 München
Germany

Phone: +49 89 5797-0
Fax: +49 89 5797-800
E-Mail: info@dorsch.de

View in maps

Description

 The combined sewer is to be divided into 2 subreaches and laid by pipe-jacking.

The centrally located departure shaft has been designed, from which the jacking will take place in both directions toward the respective target shaft.

A special feature of the works comprises the depth of the pipe below the existing combined sewers, which will be 4 to 10 metres.

Once the works are completed, the existing sewers will drain towards connecting chambers, to feed the new lower-lying sewer.

Apart from the very dense residential construction pattern, the scheme is complicated by the crossing of two main roads.

The intermediate and connecting chambers were constructed after the pipejacking in open cut.