Construction Sum

€ 19.5 million

Client

Department of Road Construction of Baden-Württemberg, District President Tübingen

Duration

From 2006 to 2008

Project Activities

  • Supervising the works and approval of materials, construction techniques and workmanship
  • Providing of expert advices for all aspects of the works
  • Reporting to the client
  • Approval of contractors work programme and sources of materials
  • Issuing interim payment certificates for monthly payments to the client
  • Claim management
  • Verification of “as-built” drawings
  • Advising the client on all matters
  • Handing over of the project to the Client
  • Defects liability period
  • Preparation of a works maintenance program.

Contact

Dorsch International Consultants GmbH

München (Headquarters)
Landsberger Str. 368
80687 München
Germany

Phone: +49 89 5797-0
Fax: +49 89 5797-800
E-Mail: info@dorsch.de

View in maps

Description

The road B12 is part of the main European Road E61 which is the most important east-west link in the Allgäu area. At this time the B12 is running through the city of Isny. This regularly leads to heavy traffic jams within city.

Therefore it is the intention of the Department of Road Construction of Baden-Württemberg to built a new main road bypassing Isny in future. The Federhalde-Tunnel will be an important part of this new main road project.

The tunnel will have a total length of 760 m build in three parts. The middle part will cross a mountain (550 m). Both ends of the tunnel will consist of an open tunnel structure (east side 45 m and west side 165 m).

The joint venture Dorsch Verkehr und Infrastruktur (leading company) and ibb-ingenieurbüro Prof. Burkhardt GmbH & Co. was entrusted by the District President Tübingen with Construction Management and Construction Supervision.

Main Data:

  • Total length of the tunnel 760 m,
  • Length of mining construction 550 m,
  • Length of open construction 210 m,
  • Lane width 7.50 m,
  • Service building,
  • Numbers of vehicles / approx. 7900/24h,
  • Numbers of trucks approx. 1000,
  • Electrical power consumption 280kVA,
  • Longitudinal ventilation with jet fans 6.