Taizz – Aden:
Double Carriageway for Amran-Aden Road, Section Taiz - Aden (153 km)

Disciplines

  • Roads
  • Transportation

Companies

Dorsch International Consultants

Construction Sum

US$ 450 million

Client

Ministry of Public Works and Highways, Republic of Yemen

Duration

From 2003 to 2006

Project Activities

Section III: Taizz – Aden (153 km):

  • Reconnaissance and Feasibility Study
  • Topographic Survey based on Aerial Photogrammetry
  • Strategic Design
  • Design Standards
  • Traffic Surveys
  • Traffic Forecast
  • Geotechnical and Hydrological Study
  • Economic Evaluation
  • Preliminary Design
  • Final Design and Tender Documents.

Contact

Dorsch International Consultants GmbH

München (Headquarters)
Landsberger Str. 368
80687 München
Germany

Phone: +49 89 5797-0
Fax: +49 89 5797-800
E-Mail: info@dorsch.de

View in maps

Description

The objective of this project is to build an additional dual carriageway connecting the main towns along the axis Taizz – Aden.

The purpose of the new dual carriageway is to enhance this vital north-south communication link, to improve safety of the users, to remove bottlenecks and therefore to reduce time of travel between Aden, Sana`a and Amran. This is a strategic policy developed by the government of Yemen to facilitate the development of the whole country. Within the scope of this project Dorsch was retained to provide Consultants´ Services for the Feasibility Study and Detailed Engineering Design.