Duration

From 1978 to 1985

Project Activities

  • Traffic study
  • Soil report incl. geotechnical construction supervision
  • Traffic engineering
  • Road design
  • Cost estimate
  • Plan approval procedure
  • Tunnel operating concept
  • Tender documents
  • Final design documents
  • Coordination of construction sequence
  • Local construction supervision
  • Time scheduling
  • Cost control

Contact

Dorsch International Consultants GmbH

München (Headquarters)
Landsberger Str. 368
80687 München
Germany

Phone: +49 89 5797-0
Fax: +49 89 5797-800
E-Mail: info@dorsch.de

View in maps

Description

The project was situated in a heavily built-up part of the city, thus necessitating the underpinning of adjacent buildings by concrete injection, as well as groundwater lowering and the relocation of utility lines.

Furthermore, the entire project had to be carried out without interrupting normal traffic in the area, which amounted to some 100 000 vehicles per day on the beltway itself, in addition to 7 cross-roads, a tram wayline, a bus route, a railway line pedestrians and local residents.

During the project period a new underground railway station was completed beneath the road tunnel and anine-track railway bridge was constructed across the depressed road leading into the road tunnel. The tunnel was constructed using the cut-and-cover method while surface traffic was channelled over the site via elevated auxiliary carriage ways placed on temporary bridges.